2003 Chevy TrailBlazer Transmission Oil Cooler Line Quick Connect Fitting Removal Procedure

0

Filed Under (Chevrolet) by admin on 10-07-2010

download
Important: The front and rear sections of the cooler lines can be serviced separately. Refer to the appropriate steps when servicing individual lines. Perform the following procedure when removing the cooler lines from the quick connect fittings. 1. Pull the plastic cap back from the quick connect fining and down along the cooler line about 5 cm (2 inch) . 2. Using a bent-tip screwdriver, pull on one of the open ends of the retaining ring in order to rotate the retaining ring around the quick connect fining until the retaining ring is out of position and can be completely removed. 3. Remove the retaining ring from the quick connect fitting. 4. Discard the retaining ring. 5. Pull the cooler line straight out from the quick connect fitting. Installation Procedure Important: Do not reuse any of existing fittings if there is excessive corrosion. Do not reuse any of the existing retaining rings that were removed from the existing quick connect fittings. All retaining rings being installed must be new. Ensure the following procedures are performed when installing the new retaining rings onto the fittings.

Related entry:

2006 Chevy Trailblazer Tune Up, 06 trailblazer ss trans cooler line routing, REPAIR 2006 TRAILBLAZER GLOVE COMPARTMENT, 20005 chevyimpala diagrama ac, 2006 trailblazer greasing caliper pins, acuater damage after battery change trailblazer, how dso i remove the diferental from a 2004 chev trailblazer 4 wheel drive, REMOVING FRONT DIFFERENTIAL ON A 2004 TRAILBLAZER,

  2003 Chevy TrailBlazer Transmission Oil Cooler Line Quick Connect Fitting Removal Procedure Direct Download speed 4887 Kb/s

  2003 Chevy TrailBlazer Transmission Oil Cooler Line Quick Connect Fitting Removal Procedure Full Version speed 5767 Kb/s

Comments are closed.