s p o n s o r e d   l i n k s


2001 Chrysler Sebring Alternator Service and Repair REMOVAL

0

Filed Under (Chrysler) by admin on 20-07-2010

download
REMOVAL 1. Open Hood. 2. Disconnect the negative battery cable. 3. Raise vehicle and support. 4. Remove the accessory drive belt splash shield. 5. Loosen the accessory drive belt refer to the cooling. 6. Remove the lower mounting bolt. 7. Lower the vehicle. Fig.5 Generator Battery Cable 8. Remove the battery cable and field connection (Fig. 5). 9. Disconnect the electrical connector to the A/C pressure switch and A/C clutch. 10. Remove the engine oil dip stick. 11. Remove the 2 upper mounting bolts. 12. Remove the generator (Fig. 6). INSTALLATION 1. Install generator (Fig. 6). 2. Install the 2 upper bolts but do not tighten. 3. Install the engine dip stick tube. 4. Connect the A/C pressure switch and A/C clutch electrical connectors. 5. Connect the battery cable and field connectors (Fig. 5). 6. Raise vehicle and support. 7. Install the lower bolt and tighten. 8. Install the accessory drive belt, refer to the cooling. 9. Install the accessory drive splash shield. 10. Lower the vehicle. 11. Tighten the 2 upper mounting bolts to 12. Connect the negative battery cable.

Related posts:

  1. CHRYSLER ALTERNATOR REMOVAL & INSTALLATION
  2. 1997 Chrysler Sebring JXi Timing Belt Installation
  3. 2005 Chrysler Sebring Engine Removal and Installation
  4. 2001 Chrysler Sebring LX POWER WINDOW MOTOR Removal
  5. 2001 Chrysler PT Cruiser Limited TIMING BELT REMOVAL & INSTALLATION

Comments are closed.