2000 Toyota CAMRY Shift Solenoid A/B Electrical Malfunc- tion

0

Filed Under (Toyota) by admin on 12-06-2010

download
INSPECTION PROCEDURE 1 Measure resistance between terminal S1 or S2 of ECM and body ground. PREPARATION: Disconnect the connector from ECM. CHECK: Measure resistance between terminal S1 or S2 of ECM and body ground. OK: S1 S2 Resistance: 11 ? 15 ? D00833 OK Check and replace the ECM. 2 Check harness and connector between ECM and automatic transaxle solenoid connector. PREPARATION: Disconnect the solenoid connector from the automatic trans- axle. CHECK: Check the harness and connector between terminal S1 or S2 of ECM and terminal S1 or S2 of solenoid connector. S2 S1 S1 OK: There is no open and no short circuit. S2

  2000 Toyota CAMRY Shift Solenoid A/B Electrical Malfunc- tion Direct Download speed 4887 Kb/s

  2000 Toyota CAMRY Shift Solenoid A/B Electrical Malfunc- tion Full Version speed 5767 Kb/s

Comments are closed.